Skip to content
Home/Bathrooms/Full bathroom remodel

Service 05 of 06

Full bathroom remodel

When the layout is the problem, changing one fixture never fixes it. A full remodel puts the plumbing, the light, the ventilation and the finishes on one plan and one schedule.

Typical timeline

Warranty

Lifetime, limited

Starting at

Full bathroom remodel with a black-framed sliding shower door, window seat and walnut vanity

Walnut & stone

Relocated vanity, new window seat

What’s included

Everything, in one contract.

One license, one crew, one supervisor. No subcontractor hand-offs you have to manage.

01

Layout & drawings

A dimensioned plan before demolition, so decisions happen on paper and not mid-build.

02

MEP coordination

Plumbing, electrical and ventilation sequenced by one supervisor, under one contract.

03

Build & finishes

Framing, waterproofing, tile, cabinetry, lighting and glass by the same crew throughout.

04

Punch & closeout

A written punch list, a walkthrough, and the manuals and as-builts handed over.

Configurations

Three ways this usually goes.

Reworked layout
Reworked layoutFixtures move. The most expensive option and usually the right one.
Primary suite
Primary suiteA larger shower, a bench, and storage planned around how you use the room.
Guest bath
Guest bathA small room done properly — where every inch has to earn its place.

How it goes

Three steps. No surprises.

  1. 01

    Consultation

    We measure the room, listen to how you use it, and say plainly whether we’re the right fit. No deposit to get this far.

  2. 02

    Scope & price in writing

    Itemized materials and labor, and a dated schedule. You keep it, compare it, and decide on your own time.

  3. 03

    Installation & handover

    One crew, one project manager, a daily update, and a walkthrough at the end. Then we stay reachable.

Straight answers

Questions we get
about this work.

All FAQs

It depends almost entirely on whether anything moves. An alcove replacement in the same footprint is the shortest job we do. A zero-threshold conversion is the longest, because the subfloor has to be opened to drop the drain. Whatever the number is, it goes in writing before you commit, and you get a daily update once we start.

Yes. Every permit the job requires gets pulled, posted on site, and closed out at the end — that last part is the one people get burned on, because an open permit surfaces years later when the house sells. 09 Bath works under 09 Build’s Florida Certified General Contractor license.

We stop, photograph it, and show you before doing anything. Rot, failed valves, old galvanized pipe and bad framing are the usual finds in South Florida houses. It becomes a written change order you approve first — it never turns up as a surprise on the invoice.

The written scope is the price. It changes only by a written change order that you sign first — which happens when we open a wall and find something nobody could have priced in advance, or when you decide to add to the job. No verbal extras, and nothing added to the final invoice that you have not already approved.

Free written price

Get full bathroom remodel priced in writing.

We measure, answer questions, and leave you with a scope you keep. No deposit, no obligation, and no follow-up campaign.

Phone
305-786-0909
Email
sales@09build.com
Hours
Mon–Fri 9am–7pm
Sat 9am–3pm